Enver Energy has 728 residential solar installs interconnected in California, active in the records from 2014 through 2019 (Jan 21, 2014 to Apr 30, 2019), most of them in Orange County (202), Los Angeles County (116) and Riverside County (98). The license number recorded on most of its installs, 987021, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
728
Last 24 months
0
Total capacity
4,086.1 kW DC
Median system size
5.1 kW DC
With battery storage
0.1% all time; no installs in the last 24 months last 24 months
Third-party owned
1.3% of 671 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 8, lease 1
Median battery size
6 kWh (1 installs list a capacity)
First install
Jan 21, 2014
Latest install
Apr 30, 2019
Counties
19
Utilities
SCE 601, PGE 127
CSLB license
987021

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014491
20152010
20163370
20171020
201820
2019370
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 728 interconnected installs with a tariff recorded (728) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.067592.7%not counted
NEM 2.0537.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 9 of Enver Energy’s installs the utility recorded a third-party ownership type: PPA 8, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Enver Energy exactly.

Third-party owner named on its installsInstalls
SUNRUN8
Greenday Finance1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 657 of Enver Energy’s 728 installs name a module maker in the “Generator Manufacturer” fields, and most of those (523, 79.6%) used modules recorded as SolarWorld.

Across all years, 728 of Enver Energy’s 728 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (728, 100.0%) used inverters recorded as Enphase.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld0523
Qcells0121
Hyundai013
OutBack Power01
Inverter makerEnphase0728
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 657 of 728 installs, inverters on 728. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
987021Not found in the CSLB License Master file pulled Nov 4, 2026722

License numbers are the ones the utilities recorded on the interconnection applications (726 of 728 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Enver Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019Total
unincorporated San Diego County987021415

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange202
Los Angeles116
Riverside98
San Bernardino91
Tulare64
Fresno59
Kings23
Kern20
Madera10
Santa Clara9
Contra Costa8
Ventura8
Alameda7
Solano4
San Joaquin3
Calaveras2
Merced2
Marin1
San Mateo1

Top cities

CityInstalls
Fresno34
Visalia27
Corona26
Mission Viejo24
Porterville20
Santa Ana20
Yorba Linda20
Hanford17
Fontana15
Bakersfield14
Lake Forest12
Ontario12
Riverside12
Tulare12
Brea11

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Enver Energy682
ENVER ENERGY46

Common questions

Where does Enver Energy install solar?

Its installs are spread across 19 counties. The most are in Orange County (202 installs), followed by Los Angeles County (116).

How often does Enver Energy install batteries with solar?

0.1% of its interconnected solar installs include battery storage across all years.

How many Enver Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 728 interconnected installs with a tariff recorded (728) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.