ENVER has 271 residential solar installs interconnected in California, active in the records from 2016 through 2019 (Jun 21, 2016 to Feb 28, 2019), most of them in San Bernardino County (54), Fresno County (52) and Orange County (42). The license number recorded on most of its installs, 987021, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
271
Last 24 months
0
Total capacity
1,695.6 kW DC
Median system size
5.7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
3.3% of 271 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 9
First install
Jun 21, 2016
Latest install
Feb 28, 2019
Counties
13
Utilities
SCE 195, PGE 76
CSLB license
987021

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016230
20171440
20181030
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 271 interconnected installs with a tariff recorded (271) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0238.5%not counted
NEM 2.024891.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 9 of ENVER’s installs the utility recorded a third-party ownership type: PPA 9, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ENVER exactly.

Third-party owner named on its installsInstalls
Spruce6
sunrun2
Sun Run1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 271 of ENVER’s 271 installs name a module maker in the “Generator Manufacturer” fields, and most of those (244, 90.0%) used modules recorded as Qcells.

Across all years, 271 of ENVER’s 271 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (271, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells0244
SolarWorld024
LG02
Hyundai01
Inverter makerEnphase0271

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 271 of 271 installs, inverters on 271. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
987021Not found in the CSLB License Master file pulled Nov 4, 2026270

License numbers are the ones the utilities recorded on the interconnection applications (271 of 271 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list ENVER’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019Total
unincorporated San Diego County987021415

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino54
Fresno52
Orange42
Los Angeles39
Riverside37
Tulare21
Kings11
Madera9
Kern2
Alameda1
Contra Costa1
Merced1
Santa Clara1

Top cities

CityInstalls
Fresno29
Clovis12
Corona10
Fontana7
Long Beach7
Apple Valley6
Mission Viejo6
Tulare6
Yorba Linda6
Chino Hills5
Hemet5
Highland5
Irvine5
Ontario5
Porterville5

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ENVER269
Enver2

Common questions

Where does ENVER install solar?

Its installs are spread across 13 counties. The most are in San Bernardino County (54 installs), followed by Fresno County (52).

How often does ENVER install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many ENVER installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 271 interconnected installs with a tariff recorded (271) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.