KILLUA ENERGY INC

How many solar installs has KILLUA ENERGY INC done in California, and which license number is on its installs?

KILLUA ENERGY INC has 212 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Nov 22, 2022 to Apr 15, 2026), most of them in Fresno County (78), Tulare County (31) and Madera County (24). CSLB lists license 1096633 (KILLUA HOME) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
212
Last 24 months
93
Total capacity
1,679.3 kW DC
Median system size
7.5 kW DC
With battery storage
53.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 90.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 212 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
135 installs, latest Apr 15, 2026
Ownership types recorded
none recorded
Median battery size
14.3 kWh (55 installs list a capacity)
First install
Nov 22, 2022
Latest install
Apr 15, 2026
Counties
28
Utilities
PGE 166, SCE 45, SDGE 1
CSLB license
1096633

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202220
2023740
20246853
20255850
2026 (through Aug 31, 2026)1010

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

135 of its 212 interconnected installs (63.7% of the 212 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Apr 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.5%not counted
NEM 2.07635.8%2 (2.6%)
Net Billing Tariff13563.7%110 (82.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on KILLUA ENERGY INC’s installs. No residential system in the file lists a third-party owner name that matches KILLUA ENERGY INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 85 of KILLUA ENERGY INC’s 93 installs name a module maker in the “Generator Manufacturer” fields, and most of those (44, 51.8%) used modules recorded as Qcells.

In the last 24 months, 93 of KILLUA ENERGY INC’s 93 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (47, 50.5%) used inverters recorded as Enphase.

In the last 24 months, 50 of KILLUA ENERGY INC’s 93 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (19, 38.0%) used batteries recorded as Enphase.

79 of 113 battery-paired PG&E and SCE installs (69.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4480
EG42525
JinkoSolar2020
CertainTeed13not in top list
REC5not in top list
Inverter makerEnphase47150
EG42525
Tesla2124
SolarEdge819
FranklinWH7not in top list
Battery makerEnphase1925
Tesla1921
FranklinWH77
sonnen318
SolarEdge28

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 200 of 212 installs, inverters on 212. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1096633KILLUA HOME (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorSep 15, 2022Sep 30, 2028211

License numbers are the ones the utilities recorded on the interconnection applications (212 of 212 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1096633. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list KILLUA ENERGY INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County109663311

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Fresno78
Tulare31
Madera24
Los Angeles9
Merced9
Santa Clara9
Kern6
Kings6
Monterey4
San Luis Obispo4
Santa Cruz4
Colusa3
Riverside3
San Joaquin3
Alameda2
Orange2
San Benito2
San Mateo2
Sutter2
Calaveras1
Contra Costa1
El Dorado1
Napa1
San Bernardino1
San Diego1
Solano1
Tuolumne1
Ventura1

Top cities

CityInstalls
Fresno48
Chowchilla12
Madera11
Clovis10
Goshen8
Visalia7
San Jose6
Woodlake5
Parlier4
Bakersfield3
Fowler3
Lancaster3
Selma3
Williams3
Atwater2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
KILLUA ENERGY INC209
Killua Energy2
Killua Energy Inc1

Common questions

Where does KILLUA ENERGY INC install solar?

Its installs are spread across 28 counties. The most are in Fresno County (78 installs), followed by Tulare County (31).

How often does KILLUA ENERGY INC install batteries with solar?

53.6% of its interconnected solar installs include battery storage across all years, and 90.2% in the last 24 months (83 of 92). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many KILLUA ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

135 of its 212 interconnected installs (63.7% of the 212 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.