SOLARREPAIR.COM LLC

How many solar installs has SOLARREPAIR.COM LLC done in California, and which license number is on its installs?

SOLARREPAIR.COM LLC has 146 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Apr 13, 2022 to Jul 29, 2026), most of them in Riverside County (58), San Bernardino County (43) and Los Angeles County (24). CSLB lists license 1083272 (SOLARREPAIR.COM LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
146
Last 24 months
71
Total capacity
1,364 kW DC
Median system size
8.6 kW DC
With battery storage
52.7% all time; 77.5% last 24 months
Third-party owned
0.0% of 146 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
69 installs, latest Jul 29, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (76 installs list a capacity)
First install
Apr 13, 2022
Latest install
Jul 29, 2026
Counties
7
Utilities
SCE 142, PGE 4
CSLB license
1083272

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022214
20234510
20241412
20253226
2026 (through Aug 31, 2026)3425

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

69 of its 146 interconnected installs (47.3% of the 146 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07752.7%28 (36.4%)
Net Billing Tariff6947.3%49 (71.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SOLARREPAIR.COM LLC’s installs. No residential system in the file lists a third-party owner name that matches SOLARREPAIR.COM LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 71 of SOLARREPAIR.COM LLC’s 71 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (28, 39.4%) used modules recorded as Hyundai.

In the last 24 months, 71 of SOLARREPAIR.COM LLC’s 71 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (54, 76.1%) used inverters recorded as Tesla.

In the last 24 months, 54 of SOLARREPAIR.COM LLC’s 71 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (49, 90.7%) used batteries recorded as Tesla.

74 of 77 battery-paired PG&E and SCE installs (96.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai2828
Qcells1919
Panasonic469
REC44
SolarWorld48
Inverter makerTesla5457
Enphase1352
Qcells33
SolarEdge127
Battery makerTesla4950
Enphase524

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 143 of 146 installs, inverters on 146. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLARREPAIR.COM LLC as developer on 51 battery storage projects and as installer on 50 (50 name it as both), 51 projects in all with 885 kWh of storage. 40 have the status Paid, with $184,059 in current incentive allocations. Applications were received from May 11, 2022 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid40609$184,059
Reserved466$9,900
Cancelled7210$54,460

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage38522$75,03932$62,283
Equity Resiliency7143$128,0006$110,500
Large-Scale Storage6220$45,3802$11,276

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1083272SOLARREPAIR.COM LLC (Limited Liability)CLEARC-10 Electrical ContractorNov 2, 2021Nov 30, 2027146

License numbers are the ones the utilities recorded on the interconnection applications (146 of 146 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1083272. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOLARREPAIR.COM LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222024Total
unincorporated San Diego County1083272112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside58
San Bernardino43
Los Angeles24
Orange16
Contra Costa3
Kern1
Ventura1

Top cities

CityInstalls
Corona17
Riverside9
Redlands8
Norco7
Eastvale6
Arcadia5
Upland5
Apple Valley4
Canyon Lake4
Chino4
Chino Hills4
Moreno Valley4
Ontario4
Hesperia3
Murrieta3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARREPAIR.COM LLC146

Common questions

Where does SOLARREPAIR.COM LLC install solar?

Its installs are spread across 7 counties. The most are in Riverside County (58 installs), followed by San Bernardino County (43).

How often does SOLARREPAIR.COM LLC install batteries with solar?

52.7% of its interconnected solar installs include battery storage across all years, and 77.5% in the last 24 months (55 of 71).

How many SOLARREPAIR.COM LLC installs are under NEM 3.0 (the Net Billing Tariff)?

69 of its 146 interconnected installs (47.3% of the 146 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.