TURNKEY CONSTRUCTION AND SOLAR INC

How many solar installs has TURNKEY CONSTRUCTION AND SOLAR INC done in California, and which license number is on its installs?

TURNKEY CONSTRUCTION AND SOLAR INC has 627 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Jan 10, 2019 to May 18, 2026), most of them in Fresno County (413), Tulare County (57) and Madera County (38). CSLB lists license 991046 (TURNKEY ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-7, C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
627
Last 24 months
12
Total capacity
6,588.4 kW DC
Median system size
8.6 kW DC
With battery storage
4.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.5% of 627 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
27 installs, latest Dec 22, 2025
Ownership types recorded
PPA 3
Median battery size
10.1 kWh (1 installs list a capacity)
First install
Jan 10, 2019
Latest install
May 18, 2026
Counties
29
Utilities
PGE 564, SCE 60, SDGE 3
CSLB license
991046

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019270
2020810
2021943
202217713
20232188
2024212
202570
2026 (through Aug 31, 2026)20

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

27 of its 627 interconnected installs (4.3% of the 627 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Dec 22, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.060095.7%26 (4.3%)
Net Billing Tariff274.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of TURNKEY CONSTRUCTION AND SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches TURNKEY CONSTRUCTION AND SOLAR INC exactly.

Third-party owner named on its installsInstalls
Sunnova3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of TURNKEY CONSTRUCTION AND SOLAR INC’s 12 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 50.0%) used modules recorded as LONGi.

In the last 24 months, 12 of TURNKEY CONSTRUCTION AND SOLAR INC’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (6, 50.0%) used inverters recorded as SMA.

In the last 24 months, none of TURNKEY CONSTRUCTION AND SOLAR INC’s 12 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

21 of 26 battery-paired PG&E and SCE installs (80.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi6not in top list
Canadian Solar2115
JinkoSolar245
SEG Solar1not in top list
Solaria1not in top list
Inverter makerSMA636
Enphase3561
Astronergy (Chint)1not in top list
GoodWe Technologies Co., Ltd.13
Tesla1not in top list
Battery makerEnphase020
Generac01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 611 of 627 installs, inverters on 627. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names TURNKEY CONSTRUCTION AND SOLAR INC as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 18 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jan 11, 2021 to Nov 19, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled218$11,385

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency110$9,7060$0
Small Residential Storage18$1,6790$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
991046TURNKEY ENERGY (Corporation)CLEARB General Building Contractor; C-7; C-10 Electrical ContractorMar 5, 2014Mar 31, 2028627

License numbers are the ones the utilities recorded on the interconnection applications (627 of 627 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 991046. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list TURNKEY CONSTRUCTION AND SOLAR INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202120222023Total
unincorporated San Diego County9910461113

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno413
Tulare57
Madera38
El Dorado21
Sonoma14
Merced11
Contra Costa9
Kings9
Santa Clara5
Solano5
Kern4
Marin4
Orange4
Los Angeles3
Mariposa3
Placer3
San Diego3
San Luis Obispo3
Tuolumne3
Alameda2
Monterey2
Napa2
San Benito2
San Joaquin2
Lake1
San Bernardino1
San Mateo1
Santa Barbara1
Santa Cruz1

Top cities

CityInstalls
Fresno183
Kerman118
Clovis74
Visalia36
Madera28
Placerville20
Sanger11
Dinuba9
Kingsburg7
Hanford6
Santa Rosa6
Tulare6
Fowler5
Reedley5
Atwater4

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TURNKEY CONSTRUCTION AND SOLAR INC602
Turnkey Construction & Solar INC20
TURNKEY CONSTRUCTION AND SOLAR, INC2
Turnkey Construction and Solar1
Turnkey Construction and Solar INC1
TurnKey Construction and Solar, Inc1

Common questions

Where does TURNKEY CONSTRUCTION AND SOLAR INC install solar?

Its installs are spread across 29 counties. The most are in Fresno County (413 installs), followed by Tulare County (57).

How often does TURNKEY CONSTRUCTION AND SOLAR INC install batteries with solar?

4.2% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 11). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many TURNKEY CONSTRUCTION AND SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

27 of its 627 interconnected installs (4.3% of the 627 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.