Ambassador Energy, Inc

How many solar installs has Ambassador Energy, Inc done in California, and which license number is on its installs?

Ambassador Energy, Inc has 347 residential solar installs interconnected in California, active in the records from 2009 through 2018 (Sep 11, 2009 to Apr 16, 2018), most of them in Riverside County (227), San Diego County (36) and Orange County (22). The license number recorded on most of its installs, 928112, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
347
Last 24 months
0
Total capacity
2,482.4 kW DC
Median system size
5.9 kW DC
With battery storage
0.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
21.2% of 231 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 4, lease 35, other 10
Median battery size
9.2 kWh (1 installs list a capacity)
First install
Sep 11, 2009
Latest install
Apr 16, 2018
Counties
16
Utilities
SCE 282, SDGE 41, PGE 24
CSLB license
928112

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200950
2010160
201150
2012290
2013440
2014980
2015770
2016540
2017180
201811
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 347 interconnected installs with a tariff recorded (347) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.033997.7%not counted
NEM 2.082.3%1 (100.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 49 of Ambassador Energy, Inc’s installs the utility recorded a third-party ownership type: PPA 4, lease 35, prepaid lease 0, other 10. No residential system in the file lists a third-party owner name that matches Ambassador Energy, Inc exactly.

Third-party owner named on its installsInstalls
SunPower Capital, LLC20
Kilowatt Systems, LLC7
SunPower SolarProgram I, LLC c/o SunPower Corporation5
SunPower3
Renewable Asset Management Co., LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 148 of Ambassador Energy, Inc’s 347 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (31, 20.9%) used modules recorded as Hyundai.

Across all years, 344 of Ambassador Energy, Inc’s 347 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (119, 34.6%) used inverters recorded as Enphase.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai031
LG023
SunPower017
Qcells014
Phono Solar Technology012
Inverter makerEnphase0119
SMA0119
SunPower040
ABB033
SolarEdge015

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 148 of 347 installs, inverters on 344. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
928112Not found in the CSLB License Master file pulled Nov 4, 2026281

License numbers are the ones the utilities recorded on the interconnection applications (283 of 347 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Riverside227
San Diego36
Orange22
Los Angeles21
San Bernardino15
Alameda8
Santa Clara4
Contra Costa3
Kern3
Fresno2
Placer1
San Mateo1
Stanislaus1
Tehama1
Tulare1
Ventura1

Top cities

CityInstalls
Murrieta92
Temecula36
Palm Desert16
Lake Elsinore13
Menifee11
Canyon Lake9
Fallbrook9
Corona8
Hemet8
San Diego8
Wildomar8
Winchester7
Sun City6
Carlsbad4
Laguna Niguel4

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AMBASSADOR ENERGY101
AMBASSADOR ENERGY,101
Ambassador Energy, Inc79
Ambassador Energy, Inc.58
Ambassador Energy5
Ambassador Energy Inc1
AMBASSADOR ENERGY INC1
AMBASSADOR ENERGY, INC1

Common questions

Where does Ambassador Energy, Inc install solar?

Its installs are spread across 16 counties. The most are in Riverside County (227 installs), followed by San Diego County (36).

How often does Ambassador Energy, Inc install batteries with solar?

0.3% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Ambassador Energy, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 347 interconnected installs with a tariff recorded (347) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.