Bear Solar Inc

How many solar installs has Bear Solar Inc done in California, and which license number is on its installs?

Bear Solar Inc has 298 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Aug 21, 2018 to Jan 20, 2026), most of them in San Diego County (180), Riverside County (21) and Orange County (15). CSLB lists license 1028222 (BEAR SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
298
Last 24 months
17
Total capacity
2,180.2 kW DC
Median system size
6.7 kW DC
With battery storage
22.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 75.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
8.1% of 298 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
34 installs, latest Jan 20, 2026
Ownership types recorded
PPA 14, lease 1, prepaid lease 9
Median battery size
13.5 kWh (19 installs list a capacity)
First install
Aug 21, 2018
Latest install
Jan 20, 2026
Counties
32
Utilities
SDGE 186, PGE 59, SCE 53
CSLB license
1028222

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
201950
2020352
2021352
2022665
20231013
2024448
2025104
2026 (through Aug 31, 2026)11

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

34 of its 298 interconnected installs (11.4% of the 298 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 31.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jan 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.026488.6%20 (20.8%)
Net Billing Tariff3411.4%5 (31.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 24 of Bear Solar Inc’s installs the utility recorded a third-party ownership type: PPA 14, lease 1, prepaid lease 9, other 0. Across all installers, 5 residential systems list a third-party owner name that matches Bear Solar Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
HDM Capital6
SolKraft6
Bear Solar Inc.5
HDM4
Everbright, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 17 of Bear Solar Inc’s 17 installs name a module maker in the “Generator Manufacturer” fields, and most of those (10, 58.8%) used modules recorded as Canadian Solar.

In the last 24 months, 17 of Bear Solar Inc’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (9, 52.9%) used inverters recorded as SolarEdge.

In the last 24 months, 6 of Bear Solar Inc’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used batteries recorded as Tesla.

21 of 25 battery-paired PG&E and SCE installs (84.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar1040
SolarJuice Technology Inc.336
EMMVEEPhotovoltaicPowerPrivateLimited1not in top list
Panasonic1not in top list
Trina Solar112
Inverter makerSolarEdge9218
APsystems (Altenergy Power System)316
Tesla36
Enphase150
Fronius1not in top list
Battery makerTesla49
APsystems (Altenergy Power System)11
Enphase14

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 275 of 298 installs, inverters on 298. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Bear Solar Inc as developer on 83 battery storage projects and as installer on 2 (2 name it as both), 83 projects in all with 2,872 kWh of storage. 27 have the status Paid, with $866,340 in current incentive allocations. Applications were received from Aug 27, 2020 to Feb 9, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid27871$866,340
Reserved4172$176,488
Pending Reservation113$35,588
Cancelled511,815$1,805,724

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency812,832$2,807,95227$866,340
Residential Solar and Storage Equity - AB 209 Non-POU113$35,5880$0
Residential Solar and Storage Equity - AB 209 POU126$40,6000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1028222BEAR SOLAR INC (Corporation)CLEAR, WC Susp PendingC-46 Solar ContractorJun 23, 2017Jun 30, 2027298

License numbers are the ones the utilities recorded on the interconnection applications (298 of 298 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1028222. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Bear Solar Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202020212022202320242025Total
City and County of San Francisco10282220011002
unincorporated San Diego County10282225513137245

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego180
Riverside21
Orange15
Contra Costa9
Los Angeles9
San Joaquin9
San Bernardino6
Ventura5
Fresno4
Yolo4
Alameda3
San Francisco3
Solano3
Tulare3
Butte2
Merced2
Placer2
San Luis Obispo2
San Mateo2
Santa Clara2
El Dorado1
Kern1
Lake1
Madera1
Marin1
Shasta1
Sonoma1
Stanislaus1
Sutter1
Tehama1
Tuolumne1
Yuba1

Top cities

CityInstalls
Chula Vista67
San Diego47
Bonita9
Murrieta6
Escondido5
La Mesa5
Oceanside5
Santee5
Corona4
El Cajon4
Huntington Beach4
National City4
Rancho Santa Fe4
Stockton4
Temecula4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Bear Solar Inc186
BEAR SOLAR INC112

Common questions

Where does Bear Solar Inc install solar?

Its installs are spread across 32 counties. The most are in San Diego County (180 installs), followed by Riverside County (21).

How often does Bear Solar Inc install batteries with solar?

22.3% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (6 of 8). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Bear Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

34 of its 298 interconnected installs (11.4% of the 298 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 31.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.