QCELLS FOR NEW HOMES

How many solar installs has QCELLS FOR NEW HOMES done in California, and which license number is on its installs?

QCELLS FOR NEW HOMES has 187 residential solar installs interconnected in California, active in the records from 2026 (Jun 10, 2026 to Aug 31, 2026), most of them in Los Angeles County (36), Riverside County (34) and San Bernardino County (28). CSLB lists license 1090641 (QCELLS FOR NEW HOMES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
187
Last 24 months
187
Total capacity
1,654 kW DC
Median system size
8.2 kW DC
With battery storage
94.7% all time; 94.7% last 24 months
Third-party owned
92.5% of 187 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
187 installs, latest Aug 31, 2026
Ownership types recorded
PPA 172, lease 1
Median battery size
13.5 kWh (133 installs list a capacity)
First install
Jun 10, 2026
Latest install
Aug 31, 2026
Counties
29
Utilities
SCE 128, PGE 59
CSLB license
1090641

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2026 to 2026

YearInstalls interconnectedWith battery storage
2026 (through Aug 31, 2026)187177

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

187 of its 187 interconnected installs (100.0% of the 187 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.7% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff187100.0%177 (94.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 173 of QCELLS FOR NEW HOMES’s installs the utility recorded a third-party ownership type: PPA 172, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches QCELLS FOR NEW HOMES exactly.

Third-party owner named on its installsInstalls
EnFin93
Axia Solar Corporation65
Enfin Solar Corporation5
Palmetto4
Palmetto LightReach3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 187 of QCELLS FOR NEW HOMES’ 187 installs name a module maker in the “Generator Manufacturer” fields, and most of those (187, 100.0%) used modules recorded as Qcells.

In the last 24 months, 187 of QCELLS FOR NEW HOMES’ 187 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (169, 90.4%) used inverters recorded as Qcells.

In the last 24 months, 168 of QCELLS FOR NEW HOMES’ 187 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (160, 95.2%) used batteries recorded as Tesla.

164 of 177 battery-paired PG&E and SCE installs (92.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells187187
JA Solar77
Canadian Solar66
Hyundai22
LONGi22
Inverter makerQcells169169
Tesla7070
Enphase3939
SolarEdge1818
SMA33
Battery makerTesla160160
SolarEdge33
Enphase22
LG22
Qcells11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 187 of 187 installs, inverters on 187. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1090641QCELLS FOR NEW HOMES (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorApr 25, 2022Apr 30, 2028187

License numbers are the ones the utilities recorded on the interconnection applications (187 of 187 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1090641. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list QCELLS FOR NEW HOMES’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023202420252026Total
City and County of San Francisco10906410618731
unincorporated San Diego County10906411392942

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles36
Riverside34
San Bernardino28
Contra Costa11
Tulare11
Alameda9
Ventura9
Orange8
Kern6
Santa Clara6
Solano4
Napa3
Calaveras2
Fresno2
Nevada2
San Mateo2
Yuba2
Amador1
Kings1
Lake1
Marin1
Monterey1
Placer1
San Francisco1
San Joaquin1
Santa Barbara1
Shasta1
Sonoma1
Tehama1

Top cities

CityInstalls
Corona7
Hesperia5
Perris5
Tulare5
Desert Hot Springs4
Fontana4
Lancaster4
Winchester4
Arcadia3
Oakland3
Pittsburg3
Rosamond3
Rowland Heights3
San Jacinto3
San Jose3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
QCELLS FOR NEW HOMES187

Common questions

Where does QCELLS FOR NEW HOMES install solar?

Its installs are spread across 29 counties. The most are in Los Angeles County (36 installs), followed by Riverside County (34).

How often does QCELLS FOR NEW HOMES install batteries with solar?

94.7% of its interconnected solar installs include battery storage across all years, and 94.7% in the last 24 months (177 of 187).

How many QCELLS FOR NEW HOMES installs are under NEM 3.0 (the Net Billing Tariff)?

187 of its 187 interconnected installs (100.0% of the 187 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.