SST CONSTRUCTION LLC

How many solar installs has SST CONSTRUCTION LLC done in California, and which license number is on its installs?

SST CONSTRUCTION LLC has 245 residential solar installs interconnected in California, active in the records from 2016 through 2021 (Mar 7, 2016 to Apr 15, 2021), most of them in Placer County (45), El Dorado County (43) and Los Angeles County (33). CSLB lists license 1009107 (SUNSYSTEM TECHNOLOGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
245
Last 24 months
0
Total capacity
1,682.5 kW DC
Median system size
6.6 kW DC
With battery storage
3.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
26.1% of 245 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 21, lease 42, other 1
Median battery size
13.5 kWh (5 installs list a capacity)
First install
Mar 7, 2016
Latest install
Apr 15, 2021
Counties
31
Utilities
PGE 172, SCE 72, SDGE 1
CSLB license
1009107

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016230
20171421
2018626
2019152
202020
202110
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 245 interconnected installs with a tariff recorded (245) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02911.8%not counted
NEM 2.021688.2%5 (2.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 64 of SST CONSTRUCTION LLC’s installs the utility recorded a third-party ownership type: PPA 21, lease 42, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches SST CONSTRUCTION LLC exactly.

Third-party owner named on its installsInstalls
Momentum Solar32
Greenspire16
American Energy6
Momentum5
For Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 240 of SST CONSTRUCTION LLC’s 245 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (59, 24.6%) used modules recorded as LG.

Across all years, 245 of SST CONSTRUCTION LLC’s 245 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (147, 60.0%) used inverters recorded as SolarEdge.

Across all years, 7 of SST CONSTRUCTION LLC’s 245 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as Tesla.

7 of 9 battery-paired PG&E and SCE installs (77.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG059
Hyundai046
Qcells043
SunPower038
Canadian Solar020
Inverter makerSolarEdge0147
Enphase056
SunPower036
SMA05
Tesla04
Battery makerTesla07

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 240 of 245 installs, inverters on 245. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SST CONSTRUCTION LLC as developer on 99 battery storage projects and as installer on 0 (0 name it as both), 99 projects in all with 1,669 kWh of storage. 72 have the status Paid, with $526,726 in current incentive allocations. Applications were received from May 1, 2017 to Jun 20, 2018.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid721,233$526,726
Cancelled27436$170,731

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage991,669$697,45772$526,726

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1009107SUNSYSTEM TECHNOLOGY (Limited Liability)CLEAR, BOND Pay PendingC-10 Electrical ContractorNov 19, 2015Nov 30, 2027235

License numbers are the ones the utilities recorded on the interconnection applications (244 of 245 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1009107. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SST CONSTRUCTION LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820232024Total
City and County of San Francisco10091070101
unincorporated San Diego County10091071113

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Placer45
El Dorado43
Los Angeles33
Riverside15
Fresno12
Yolo10
Orange8
San Bernardino8
Alameda6
Ventura6
Yuba6
Contra Costa5
San Joaquin5
Sutter5
Napa4
Nevada4
Solano4
Amador3
Butte3
Calaveras3
Shasta3
Tulare3
Glenn2
San Mateo2
Colusa1
Kern1
Madera1
Marin1
Monterey1
San Diego1
San Francisco1

Top cities

CityInstalls
El Dorado Hills22
Lincoln15
Rocklin12
Shingle Springs9
Fresno7
Granite Bay7
West Sacramento7
Auburn6
Hacienda Heights5
Placerville5
Cameron Park4
Marysville4
Stockton4
Yuba City4
Chico3

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SST CONSTRUCTION LLC181
sst construction llc37
SST Construction LLC19
SST Construction6
SST CONSTRUCTION1
SST Construction, LLC1

Common questions

Where does SST CONSTRUCTION LLC install solar?

Its installs are spread across 31 counties. The most are in Placer County (45 installs), followed by El Dorado County (43).

How often does SST CONSTRUCTION LLC install batteries with solar?

3.7% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SST CONSTRUCTION LLC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 245 interconnected installs with a tariff recorded (245) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.