How many solar installs has Solar Spectrum done in California, and which license number is on its installs?

Solar Spectrum has 951 residential solar installs interconnected in California, active in the records from 2017 through 2020 (May 11, 2017 to Oct 10, 2020), most of them in Alameda County (98), Contra Costa County (97) and Santa Clara County (86). The license number recorded on most of its installs, 1032817, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
951
Last 24 months
0
Total capacity
6,590.4 kW DC
Median system size
6.4 kW DC
With battery storage
2.4% all time; no installs in the last 24 months last 24 months
Third-party owned
20.8% of 951 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 184, lease 13, prepaid lease 1
Median battery size
9.8 kWh (19 installs list a capacity)
First install
May 11, 2017
Latest install
Oct 10, 2020
Counties
42
Utilities
PGE 625, SCE 326
CSLB license
1032817, 909236, 103817

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
20174320
20182421
20192235
20205417
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 951 interconnected installs with a tariff recorded (951) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0535.6%not counted
NEM 2.089894.4%23 (2.6%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 198 of Solar Spectrum’s installs the utility recorded a third-party ownership type: PPA 184, lease 13, prepaid lease 1, other 0. Across all installers, 101 residential systems list a third-party owner name that matches Solar Spectrum exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Solar Spectrum LLC83
Sunnova57
Sunrun39
Sungevity15
SolarSpectrum3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 936 of Solar Spectrum’s 951 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (388, 41.5%) used modules recorded as Trina Solar.

Across all years, 951 of Solar Spectrum’s 951 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (911, 95.8%) used inverters recorded as SolarEdge.

Across all years, 22 of Solar Spectrum’s 951 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (22, 100.0%) used batteries recorded as LG.

22 of 23 battery-paired PG&E and SCE installs (95.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar0388
Qcells0258
LG0159
LONGi082
Canadian Solar040
Inverter makerSolarEdge0911
Enphase036
ABB08
SMA05
Power-One04
Battery makerLG022

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 936 of 951 installs, inverters on 951. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1032817Not found in the CSLB License Master file pulled Nov 4, 2026564
909236Not found in the CSLB License Master file pulled Nov 4, 2026237
103817Not found in the CSLB License Master file pulled Nov 4, 202615

License numbers are the ones the utilities recorded on the interconnection applications (821 of 951 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Alameda98
Contra Costa97
Santa Clara86
Riverside83
Los Angeles77
San Bernardino68
Orange42
San Joaquin41
Fresno34
Kern31
Solano31
Ventura28
Sonoma23
Merced17
San Mateo16
Tulare16
Placer13
El Dorado11
Kings11
San Luis Obispo11
Yuba11
Madera10
Butte9
San Francisco9
Yolo9
Monterey8
Calaveras7
Marin7
Santa Barbara7
Tehama7
Lake4
Napa4
Santa Cruz4
Stanislaus4
Sutter4
San Benito3
Amador2
Mariposa2
Nevada2
Shasta2
Colusa1
Mendocino1

Top cities

CityInstalls
San Jose55
Bakersfield23
Corona18
Fremont18
Oakland16
Antioch15
Fresno15
Livermore14
Brentwood13
Fontana13
Hayward13
Murrieta13
Stockton12
Tracy12
Clovis9

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Spectrum542
Solar Spectrum LLC232
SOLAR SPECTRUM LLC120
Solar Spectrum, LLC26
Solar SPectrum23
SOLAR SPECTRUM8

Common questions

Where does Solar Spectrum install solar?

Its installs are spread across 42 counties. The most are in Alameda County (98 installs), followed by Contra Costa County (97).

How often does Solar Spectrum install batteries with solar?

2.4% of its interconnected solar installs include battery storage across all years.

How many Solar Spectrum installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 951 interconnected installs with a tariff recorded (951) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.