How many solar installs has MYERS ELECTRIC COMPANY INC done in California, and which license number is on its installs?

MYERS ELECTRIC COMPANY INC has 772 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Oct 17, 2016 to Apr 9, 2026), most of them in San Bernardino County (121), Los Angeles County (110) and Riverside County (64). CSLB lists license 972274 (MYERS ELECTRIC COMPANY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
772
Last 24 months
12
Total capacity
5,773.2 kW DC
Median system size
6.9 kW DC
With battery storage
8.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 16.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
4.0% of 772 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
71 installs, latest Sep 16, 2025
Ownership types recorded
PPA 1, lease 30
Median battery size
9.8 kWh (49 installs list a capacity)
First install
Oct 17, 2016
Latest install
Apr 9, 2026
Counties
41
Utilities
SCE 378, PGE 342, SDGE 52
CSLB license
972274

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
2017170
201870
201930
2020751
202129427
20221129
202318711
20246710
202571
2026 (through Aug 31, 2026)21

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

71 of its 772 interconnected installs (9.2% of the 772 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 18.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Sep 16, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.030.4%not counted
NEM 2.069890.4%46 (7.1%)
Net Billing Tariff719.2%13 (18.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 31 of MYERS ELECTRIC COMPANY INC’s installs the utility recorded a third-party ownership type: PPA 1, lease 30, prepaid lease 0, other 0. Across all installers, 11 residential systems list a third-party owner name that matches MYERS ELECTRIC COMPANY INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SUNNOVA10
Sunrun10
MYERS ELECTRIC COMPANY INC9
Sunnova Energy Corporation2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of MYERS ELECTRIC COMPANY INC’s 12 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5, 50.0%) used modules recorded as United Renewable Energy.

In the last 24 months, 12 of MYERS ELECTRIC COMPANY INC’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (6, 50.0%) used inverters recorded as Enphase.

In the last 24 months, 2 of MYERS ELECTRIC COMPANY INC’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

52 of 60 battery-paired PG&E and SCE installs (86.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy5110
Qcells2235
Canadian Solar1not in top list
JA Solar1not in top list
JinkoSolar1not in top list
Inverter makerEnphase6386
SolarEdge4299
Generac120
Hoymiles1not in top list
Battery makerEnphase111
Generac121

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 687 of 772 installs, inverters on 772. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names MYERS ELECTRIC COMPANY INC as developer on 0 battery storage projects and as installer on 9 (0 name it as both), 9 projects in all with 131 kWh of storage. 4 have the status Paid, with $43,389 in current incentive allocations. Applications were received from May 1, 2020 to Aug 1, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid464$43,389
Cancelled448$21,450
RRF Rejected119$3,882

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency580$60,8133$41,013
Small Residential Storage224$4,0261$2,376
Residential Storage Equity17$00$0
Not stated119$3,8820$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
972274MYERS ELECTRIC COMPANY INC (Corporation)CLEARC-10 Electrical ContractorApr 20, 2012Aug 31, 2027770

License numbers are the ones the utilities recorded on the interconnection applications (772 of 772 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 972274. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list MYERS ELECTRIC COMPANY INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202020212023Total
City and County of San Francisco9722741012
unincorporated San Diego County97227456617
unincorporated Marin County9722742305

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino121
Los Angeles110
Riverside64
Orange60
Alameda58
Santa Clara55
San Diego45
Contra Costa37
Kern37
San Joaquin18
San Mateo17
Ventura17
San Francisco13
Sonoma13
Marin11
Monterey10
Solano9
El Dorado8
Placer8
Madera7
Fresno6
Santa Barbara6
Tulare6
Napa5
Lake4
San Luis Obispo4
Merced3
Santa Cruz3
Calaveras2
Kings2
Mariposa2
Sutter2
Amador1
Colusa1
Humboldt1
Mendocino1
San Benito1
Shasta1
Stanislaus1
Tuolumne1
Yuba1

Top cities

CityInstalls
San Jose39
Bakersfield31
Apple Valley20
San Diego18
Fremont16
Ontario13
San Francisco13
Corona11
Fontana11
Long Beach11
Rancho Cucamonga11
Palmdale9
Beaumont8
Fullerton8
Murrieta8

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MYERS ELECTRIC COMPANY INC694
Myers Electric59
MYERS ELECTRIC CO16
Myers electric1
Myers Electric Co1
Myers Electric Company1

Common questions

Where does MYERS ELECTRIC COMPANY INC install solar?

Its installs are spread across 41 counties. The most are in San Bernardino County (121 installs), followed by Los Angeles County (110).

How often does MYERS ELECTRIC COMPANY INC install batteries with solar?

8.3% of its interconnected solar installs include battery storage across all years, and 16.7% in the last 24 months (2 of 12). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many MYERS ELECTRIC COMPANY INC installs are under NEM 3.0 (the Net Billing Tariff)?

71 of its 772 interconnected installs (9.2% of the 772 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 18.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.