Velocity Solar Power Inc has 763 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Sep 23, 2015 to Jun 23, 2026), most of them in Placer County (216), San Joaquin County (145) and Merced County (59). CSLB lists license 1005557 (VELOCITY SOLAR POWER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Velocity Solar Power Inc here carry more than one CSLB license number: 1005557 on 745 (CSLB holder VELOCITY SOLAR POWER INC, Oakdale) and 1010000 on 16 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
763
Last 24 months
55
Total capacity
7,263.9 kW DC
Median system size
8.2 kW DC
With battery storage
3.4% all time; 27.3% last 24 months
Third-party owned
2.1% of 763 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
64 installs, latest Jun 23, 2026
Ownership types recorded
PPA 15, lease 1
Median battery size
7 kWh (4 installs list a capacity)
First install
Sep 23, 2015
Latest install
Jun 23, 2026
Counties
38
Utilities
PGE 756, SCE 7
CSLB license
1005557, 1010000

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015110
2016910
2017710
2018890
2019840
2020691
2021590
20221011
20231052
2024367
2025348
2026 (through Aug 31, 2026)137

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

64 of its 763 interconnected installs (8.4% of the 763 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 28.1% of those include battery storage. The latest Net Billing Tariff install was approved Jun 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010714.0%not counted
NEM 2.059277.6%8 (1.4%)
Net Billing Tariff648.4%18 (28.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 16 of Velocity Solar Power Inc’s installs the utility recorded a third-party ownership type: PPA 15, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Velocity Solar Power Inc exactly.

Third-party owner named on its installsInstalls
Sunnova12
Titan Solar2
CM Solar Developer1
Sunrun1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 53 of Velocity Solar Power Inc’s 55 installs name a module maker in the “Generator Manufacturer” fields, and most of those (34, 64.2%) used modules recorded as Qcells.

In the last 24 months, 55 of Velocity Solar Power Inc’s 55 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (31, 56.4%) used inverters recorded as SolarEdge.

In the last 24 months, 14 of Velocity Solar Power Inc’s 55 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (6, 42.9%) used batteries recorded as Enphase.

21 of 26 battery-paired PG&E and SCE installs (80.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells34683
Trina Solar2122
Inverter makerSolarEdge31603
Enphase2146
Tesla44
SMA1117
Battery makerEnphase68
SolarEdge44
Tesla33
LG16

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 738 of 763 installs, inverters on 763. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1005557VELOCITY SOLAR POWER INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorJul 14, 2015Jul 31, 2027745
1010000Not found in the CSLB License Master file pulled Nov 4, 202616

License numbers are the ones the utilities recorded on the interconnection applications (762 of 763 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1005557. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Velocity Solar Power Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
City and County of San Francisco100555711

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Placer216
San Joaquin145
Merced59
Butte43
Stanislaus36
Contra Costa32
Sutter31
Fresno26
Solano23
El Dorado17
Shasta12
Amador11
Glenn11
Yuba11
Santa Clara10
San Mateo9
Madera8
Yolo8
Alameda7
Tulare7
Nevada6
Tehama5
Tuolumne5
Calaveras4
Sonoma4
Marin2
Mariposa2
Monterey2
Plumas2
Kings1
Lassen1
Mendocino1
Napa1
Riverside1
Sacramento1
San Benito1
San Francisco1
San Luis Obispo1

Top cities

CityInstalls
Stockton72
Loomis57
Granite Bay38
Manteca35
Rocklin34
Yuba City30
Chico28
Auburn25
Merced23
Fresno21
Lincoln21
Oakdale20
Penryn15
Atwater14
Newcastle14

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
VELOCITY SOLAR POWER INC435
Velocity Solar Power Inc175
Velocity Solar Power105
Velocity Solar Power, Inc47
Velocity Solar Power, inc1

Common questions

Where does Velocity Solar Power Inc install solar?

Its installs are spread across 38 counties. The most are in Placer County (216 installs), followed by San Joaquin County (145).

How often does Velocity Solar Power Inc install batteries with solar?

3.4% of its interconnected solar installs include battery storage across all years, and 27.3% in the last 24 months (15 of 55).

How many Velocity Solar Power Inc installs are under NEM 3.0 (the Net Billing Tariff)?

64 of its 763 interconnected installs (8.4% of the 763 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 28.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.